Grading of our unique oceanfront terraces in the Las Playas and Vista al Mar communities which will provide every home a spectacular ocean view is currently nearing completion.  Preliminary grading of the Campos de Golf community has been completed.  Construction of retaining walls and installation of power, water and wastewater infrastructure is underway.  Our state-of-the-art terracing design provides virtually every home with a glorious view of the Pacific Ocean, Ceibo Valley Golf Club, or in many cases both (not just the front row of homes like in most communities).

First homes in Vista al Mar A row are now under construction.  Both the retaining wall and road base and subbase for this street is completed.  The final road will be completed after the construction of houses where heavy equipment is no longer required.

Clearing and preliminary shaping has been completed on every hole for our world-class Ceibo Valley Golf Course.  Holes 14, 15 and 16 have drainage completed on greens and bunkers, and planting of natural grasses is underway.  Shaping of the 13th and 17th has been completed and drainage and irrigation systems are expected to be installed shortly.  Final shaping is underway on holes 10, 11, 12 and 18.  As soon as the final shaping is completed, our shapers will start the final shaping of the front nine of the course.

Horse pasture fences are currently one-third complete and temporary shelters for horses will soon be built.  Once additional teak posts arrive we will complete the remaining pastures.

Last updated on 6 April 2016.